Auction Ended
Quaker Boy - Challenging Jake, Black
Sold
As Is
QTY 1
$0.00
MSRP
MSRP is a sample online retail price.
$20.00
Last Update:
07/07/2025, 3:08 AM ESTItem Information
MSRP:
MSRP is a sample online retail price.
$20.00
Brand:
Quaker Boy
Condition:
As Is
Description:
The Challenging Jake gobble call is a shaker call that has the high pitch gobble of a young jake. Remarkable sound quality and volume. Operable with one or two hands. Simple to use.
Lot Code:
WBS3250566
Width:
4.0 inches
Depth:
2.6 inches
Weight:
0.2 pounds
Length:
10.9 inches
Additional Info:
As Is
Pickup Location:
1825 Webster Street, Dayton OH 45414
Warehouse Location:
K2
Auction Number
WBS2502434